The challenge
Knox Street needed a rapid streetscape refresh ahead of a major event, aiming to enhance the look of their streetlights with a sleek black finish. The project presented several challenges:
- Tight Timeline – Work had to be completed within a single shift to minimize disruptions.
- High-Traffic Location – The team operated in a congested area with limited work windows.
- Durability Requirements – The coating had to withstand constant exposure to weather changes and frequent contact from pedestrians.
With these constraints, Knox Street required a high-performance coating solution that delivered both aesthetic appeal and long-term protection while meeting the project’s strict deadline.